南宫NG·28(中国)相信品牌力量

REFERENCE HIGHLIGHTS

BACK KR Pretreatment of Hot Metal for Rockcheck, China
SHARE:


Duration:2013 - 2014


Scope:120t KR hot metal desulfurization station and auxiliary dedusting facilities


Technical Data:final sulfur content ≤0.001%


Highlights: main process and equipment are developed independently by Sinosteel MECC, reaching international advanced level


Beijing ICP No.11020457 Technical support : zc-yd

INVESTED COMPANIES

  • Sinosteel Engineering Design & Research Institute
  • Sinosteel Tiancheng Environmental Protection
  • Wuhan Tianyu Intelligent Manufacturing Co., Ltd.
  • Sinosteel Tendering Co., Ltd.

LINKS

  • China Iron and Steel Association
  • Ministry of Commerce of P. R. China
  • China Securities Regulatory Commission
友情链接: